AF Gruppen (AFG) have in a consortium with Heerema Marine Contractors (HMC) now signed the contract with Fairfield Betula Limited for the removal and disposal of the Dunlin Alpha topside on the UK continental shelf, after the parties signed a letter of intent (announced 18 September 2018).

The contract includes Engineering, Preparation, Removal & Disposal (EPRD) of the Dunlin Alpha topside with a total tonnage of approx. 20 000 tonnes. The engineering will commence immediately and the platform is to be removed and disposed in the period between 2021 – 2024.